China Mobile Hong Kong

China Mobile Hong Kong

Backup power for CMHK: 800kVA Genset replacement

In 2020, TURNKEY was appointed to replace the 800kVA Generator set at Mita center rooftop for China Mobile in Kwai Tsing, Hong Kong.

The scope of the replacement includes improvement works not limited to the structural, fire services and electrical systems. All of the requirements in the project must also be complied with the relevant local and international standards and codes of practices in order to meet the deployment of the generator set now and in the future.

Throughout the entire project, from design, material ordering and delivery, installation and T&C stage, TURNKEY has completed each step with excellence and professionalism. With the aforementioned professional equipment and talents in the team, from the shipment to the hoisting, from the installation to the SAT, the project is now completed in a timely manner.

Features

  • Concrete bedding (reconstruction)
  • 90 degree heat detector (relocation)
  • Generator MCCB and wiring (modification


Back to projects page →